Safe, permitted demolition for residential and commercial properties in North York
aMaximum Construction provides safe, efficient demolition services for residential and commercial properties in North York. Whether you need interior selective demolition for a renovation or complete structure removal, our team handles the job with full compliance to Ontario safety regulations and city permits.
All demolition work in North York is performed in compliance with the Ontario Occupational Health and Safety Act, Ontario Building Code, and City of Toronto / York Region demolition permit requirements. We conduct pre-demolition surveys to identify hazardous materials, locate utilities, and plan safe work procedures before a single wall comes down.
In most cases, yes. Structural demolition and full building removals require a demolition permit from the city. Interior selective demolition for renovation purposes may not require a separate permit. aMaximum Construction assesses your project and handles all permit requirements in North York.
Interior demolition for a single room typically takes 1–2 days. Full structure demolition in North York can take 1–5 days depending on size. We provide a detailed timeline in your quote.
Yes — all our demolition services in North York include full debris removal and site cleanup. We haul away all materials and leave a clean, broom-swept site ready for the next phase of work.
Contact us for a fast, free estimate on your North York demolition project.
BOOK NOWWe are a licensed and insured general contractor serving Toronto and the GTA since 2018.
WSIB clearance, $2M liability insurance, and all permits handled. You are protected from start to finish.
Detailed written quote before any work begins. No hidden fees, no surprise invoices at the end.
We coordinate all trades under one contract. You deal with us — not a dozen different contractors.
Milestone-based schedule with regular updates. We show up when we say we will and finish when we say we will.
Written warranty on all work. We use quality materials and back every job with a workmanship guarantee.
Clean jobsite every day. We treat your home with respect — no mess left behind, no damage to surroundings.
We source quality materials and tools from leading construction retailers across Canada & North America.
Yes. Our demolition service in North York includes all debris removal and disposal at approved facilities. We separate materials for recycling where possible (concrete, metal, wood). Disposal fees are included in our written quotes — no surprise charges.
Yes, but load-bearing wall removal in North York requires a permit and engineering review. We coordinate with structural engineers, obtain the permit, install temporary shoring during the work, and install the required beam to carry the load safely.
Interior room demo in North York: 1–2 days. Full kitchen or bathroom gutting: 2–3 days. Basement demolition: 3–5 days. Full house demolition: 3–7 days. Timeline includes debris removal and site cleanup. We provide a schedule at the start of every project.
Yes. Selective demolition is one of our specialties in North York. We can remove a specific wall (load-bearing or non-load-bearing), a section of deck, old bathroom finishes, or any targeted area while protecting the rest of your home.
Interior room demolition in North York runs $1,500–$5,000 depending on size and disposal requirements. Full kitchen demo: $2,000–$4,000. Deck removal: $1,000–$3,000. Full residential demolition: $15,000–$40,000+. We provide detailed quotes including disposal fees.
For smaller jobs in North York (single room demo, deck removal), we can often schedule within 1–2 weeks. For larger projects, scheduling depends on permit timelines and crew availability. Contact us for current availability and fast quotes.
We provide interior and exterior demolition services in North York: room gutting, wall removal, bathroom and kitchen demo, basement demolition, deck and fence removal, shed and garage demolition, concrete breaking, and full residential teardowns.
In North York, permits are required for: structural wall removal, full building demolition, and projects affecting load-bearing elements. Interior soft demolition (gutting finishes, removing non-structural walls) typically doesn't require a permit. We advise on requirements for your project.
For homes built before 1990 in North York, we recommend asbestos testing before demolition begins. If hazardous materials are found, we bring in certified abatement contractors. We do not disturb suspected asbestos materials without proper testing and clearance.
We use heavy-duty plastic sheeting, dust barriers, and floor protection in North York homes to contain dust and debris. For exterior demolitions, we protect landscaping and neighbouring properties. Cleanup is part of every job.